Lower Balonne Flow Updates

  The Condamine catchment recieved good rainfall in early 2021 with some areas recieving up to 200 mm between January and March. Runoff from these rains contributed to natural inflows that complimented Commonwealth water for the environment. Stay current with these events and their outcomes via the CEWO Event updates below. Event update #1 –…

Issue 12 A turtle’s go with no flow

The Gwydir River valley is home to a diverse range of aquatic species that rely on flows of fresh water to survive and thrive. The 2019 calendar year was the driest on record and the drought saw record low rainfall which led to sustained periods of no flow. Very dry conditions combined with high temperatures and local bushfires had to place a lot of pressure on the plants and animals of the Gwydir. In this little story we’ll provide some insight into how the system responded.

Issue 11 When wetlands boom

Dr Sarah Mika is a lover of water and the life that teems in its presence. From water quality to microinvertebrates to macroinvertebrates, Sarah is passionate about the small things that make wetlands boom. In this story Sarah tells of this passsion; how it started while studying and playing in the coastal rivers of NSW and how it’s fuelled now by researching various wetlands of the northern Murray-Darling Basin for the CEWO’s Flow-MER Project.

Northern Waterhole Top-up – Flow Updates

The last four years have been the driest on record across much of the northern Murray-Darling Basin, despite rain earlier in 2020, and the current La Nina. Parts of the Barwon River have not flowed for over 60 days, and the river is drying back to waterholes. So, the Commonwealth Environmental Water Office (CEWO) have coordinated for freshes of water for the environment to be released down 200+ km’s of the upper Barwon system between December 2020 and January 2021.

Edition #3 “Going with with Flow”

The Commonwealth Environmental Water Office (CEWO) have released Edition #3 of Going with the Flow. Check it out for a summary of the latest basin-wide monitoring activities for the MER project.

A basin-scale highlights map is also available below for a brief on how our rivers and wetlands were tracking over winter/spring 2020.

Helping fish in the Gwydir recover from drought

Water for the environment will complement recent natural flows to support the replenishment of channels and wetlands in the Gwydir valley between late spring and summer 2020-21. These flows aim to help native fish survival by providing access to refuge habitat and food, increase connectivity within the Gwydir system and improve water quality in pools.